Comm. Ave. Could Look A Lot Different, If You Speak Up!

Written by Boston Biker on Nov 05

And that would be a good thing, the street is currently one of the busiest and in my opinion worst designed streets in the city.

Public Comments are due by November 25!  So make sure you contact Zach Wassmouth, Project Manager, BPWD ([email protected]) and let him know you want more pedestrian and cyclist friendly infrastructure on Comm. Ave.!

Layout1

PERSP_Scene-1-640x350

HarvComm--640x350

Layout2

 

From the KeepBostonMoving.org site:

Neighborhood: Allston/Brighton

Description: The Boston Public Works Department is redesigning Commonwealth Avenue between Brighton Avenue (Packard’s Corner) and Warren/Kelton Streets.  With its solid apartment blocks, unique carriage roads, landscaped median, and MBTA transit reservation, this segment of Comm. Ave. is both a multi-modal transportation corridor and home for thousands of people.    The redesigned corridor will feature separated bicycle facilities, improvements to pedestrian sidewalks and crosswalks, enhanced access to the MBTA Green Line, preservation and enhancement of historic landscape features, and implementation of innovative sustainable features.    The centerpiece of the project will be the redesigned intersection of Commonwealth Avenue and Harvard Avenue. Through a combination of geometric improvements and urban design features, this busy commercial and transit hub will be revitalized, with an emphasis on maximizing pedestrian space and amenities.

At completion, Commonwealth Avenue will be a livable, walkable, multimodal, green and sustainable corridor, safely and efficiently accommodating all users of this signature Boston Boulevard.

Project Status: In design

Estimated Project Cost: $20,000,000

Estimated Project Start: 2016

Estimated Project Completion: 2020

Project Design Team:

  • Zach Wassmouth, Project Manager, BPWD
  • Consultant Team – HDR Engineering, Inc. teamed with Crosby Schlessinger Smallridge, LLC, Ronald W. Buia, Inc., SMC, RM Engineering, Inc.

Additional Information:

Comm Ave Meeting Flyer (11-17-14)

Comm Ave Phase 3 & 4 Public Meeting #1 Presentation

Public Meeting Minutes 11-17-14

Comm Ave Meeting Flyer (10-27-15)

Comm Ave Phase 3 & 4 Public Meeting #2 Presentation


submit Comm. Ave. Could Look A Lot Different,  If You Speak Up! to reddit.com Add to Reddit.


Tags: , , ,
Posted in advocacy, Commuting, infrastructure | Comments Off on Comm. Ave. Could Look A Lot Different, If You Speak Up!

Sorry, comments for this entry are closed at this time.