Help Fix The River Street/Western Ave Bridges

Written by Boston Biker on Feb 02

We all know river street and western ave need some work, the bike lanes are lakes (frozen at this time of year) and pot hole central (I may or may not have broken my collar bone on one). Go tell these people you want bike lanes, and bike accommodations on river street, western ave, and the bridges! These are major bike corridors and need a lot of improvement.

Press release below

————————-

The Massachusetts Department of Transportation’s Highway Division Invites You to a Public Information Meeting for the River Street Bridge/Western Avenue Bridge Rehabilitation Project

Wednesday, February 3, 2010
6:00 PM – 8:00 PM
Honan-Allston Branch Library
300 North Harvard Street, Allston, MA

The purpose of this meeting is to provide an overview of the proposed rehabilitation of the historic River Street and Western Avenue Bridges, introduce MassDOT’s design team, answer questions and gather comments.

The River Street Bridge/Western Avenue Bridge Rehabilitation Project is being undertaken by MassDOT as part of the Commonwealth’s Accelerated Bridge Program. The goals of the project are to improve structural integrity and enhance accessibility. The main objectives are to repair deteriorating elements of the bridges, upgrade structural capacity and improve local street connections and accessibility. The proposed rehabilitation will respect the documented historic status of these landmark structures and preserve as many of the original elements as possible. The River Street Bridge was constructed in 1926 and the Western Avenue Bridge was constructed in 1924. Both bridges are listed on the State and National Registers of Historic Places and serve as primary connections between Cambridge and Boston.

If you have questions or would like more information about the project, please contact Robert Antico, MassDOT Highway Division Project Manager, [email protected].

To be added to the project email or US Mail distribution lists, please contact Stephanie Boundy, Public Outreach Coordinator for MassDOT’s Accelerated Bridge Program, at 617-973-8049 or [email protected].

The library is accessible. To request language or access accommodations, please contact Stephanie Boundy at the above email address or phone number at least 10 days in advance. In case of inclement weather, meeting cancellation announcements will be posted on http://www.massdot.state.ma.us/Highway/.

Please share this notice with others who may be interested in the project.


submit Help Fix The River Street/Western Ave Bridges to reddit.com Add to Reddit.


Tags: , , ,
Posted in advocacy | Comments Off on Help Fix The River Street/Western Ave Bridges

Sorry, comments for this entry are closed at this time.